CasesNational Key ProjectsHeat-shrinkable Tape Project for the Middle Section (Henan-Hubei Segment) of the 3rd West-to-East Gas Transmission Pipeline

Heat-shrinkable Tape Project for the Middle Section (Henan-Hubei Segment) of the 3rd West-to-East Gas Transmission Pipeline

Construction Scheme: On-site Production + Sampling Inspection + Mechanized Field Joint Coating
Construction Conclusion:Third-party test results of the products comply with relevant standards and specifications, ensuring the smooth implementation of the field joint coating project.

Anti‑Corrosion Field Joint Coating in Henan‑Hubei Complex Hilly Terrain for National Pipeline Network Long‑Distance Pipeline
Heat‑Shrinkable Tape Mechanized Anti‑Corrosion Construction for Φ1219 mm Main Gas Pipeline
Heat‑Shrinkable Tape Joint Coating, Third West‑to‑East Gas Pipeline Middle‑Route Henan‑Hubei Section
Changyuan Changtong Gained Client Stamped Acceptance for West‑Third Central (Henan‑Hubei Section) Project on National Official Platform
Anti‑Corrosion Field Joint Coating in Henan‑Hubei Complex Hilly Terrain for National Pipeline Network Long‑Distance Pipeline
Heat‑Shrinkable Tape Mechanized Anti‑Corrosion Construction for Φ1219 mm Main Gas Pipeline
Heat‑Shrinkable Tape Joint Coating, Third West‑to‑East Gas Pipeline Middle‑Route Henan‑Hubei Section
Changyuan Changtong Gained Client Stamped Acceptance for West‑Third Central (Henan‑Hubei Section) Project on National Official Platform

Project Introduction

From 2022 to 2023, Changyuan Changtong New Materials Co., Ltd. supplied a total of 20,994 sets of FRDP 1219*520/2.7mm radiation cross-linked polyethylene heat-shrinkable tapes (supporting primer with 200-micron dry film thickness) for the Henan-Hubei Section of West-East Gas Pipeline III.
The products performed excellently during on-site application and received unanimous recognition from the construction party, supervision party and project owner.

  • Project Name
    Heat-shrinkable Tape Project for the Middle Section (Henan-Hubei Segment) of the 3rd West-to-East Gas Transmission Pipeline
  • Installation Time
    2022-2023
  • Project Notes
    West-East Gas Pipeline III (Henan-Hubei Section)